Original Draft Environmental Impact Statements
- Environmental Assessment
for the Proposed Construction, Operation, and Maintenance of
Tactical Infrastructure — U.S. Border Patrol Del Rio Sector,
Texas (Draft)
(PDF, 318 pages, 50.6MB)
- Environmental Assessment for
the Eagle Pass Road and Various Infrastructures Project —
Del Rio Sector, Office Of Border Patrol Maverick County, Texas (Final)
(PDF, 191 pages, 5.2MB)
- Supplemental Environmental
Assessment II for the Proposed Construction, Operation and
Maintenance of Tactical Infrastructure — U.S. Border Patrol
El Paso Sector, Deming Station, New Mexico (Draft)
(PDF, 202 pages, 70.3MB)
- Environmental Assessment for the
Proposed Construction, Operation and Maintenance of Tactical
Infrastructure — U.S. Border Patrol Marfa Sector, Texas
(Draft)
(PDF, 328 pages, 108.8MB)
- Environmental Impact
Statement for Construction, Maintenance, and Operation of Tactical
Infrastructure — Rio Grande Vallery Sector, Texas
(Draft)
(PDF, 538 pages, 25MB)